Photo: Lendlease

Wood: Hospitality flair and performance

Project Details

The Redstone facility is the fourth CLT project Lendlease has delivered worldwide. The Redstone project consisted of 1,200 CLT panels, 11 columns, 44 beams, and more than 201,000 CLT fasteners. All window and door openings were precut. To meet Army requirements, CLT exterior wall panels are 5 inches thick, with 3- and 4-inch interior walls, and 7-inch-thick floor slabs. The project delivered in March 2016. To meet Candlewood Suites brand standards, the CLT walls and floors are covered in gypsum board and carpet, encapsulating the timber effect.